BUCHAREST/GALAȚI, 31 October 2026 — Liberty Galați is preparing to move most of its workforce, about 2,200 employees, into temporary unemployment arrangements starting 1 November, according to notices reported by Romanian media. The measure is linked to a worsening financial and operational situation at the Southeast Europe steelworks. The company’s latest step follows a period marked by production inactivity and difficulties affecting wages and operations.
Romanian reporting said the planned change comes after prolonged downtime, unpaid wages, and problems related to electricity supply and employee transportation. An internal management notice cited by media on 29 October stated that the plant would enter a temporary interruption regime during November. Employees needed for security, maintenance, and preservation of equipment would continue working during the interruption period.
The same arrangements were reported to cover personnel at Liberty Tubular Products. When the notices were described in the media, the exact number of workers to be placed on temporary unemployment had not been confirmed. The company’s decision was therefore presented without a final figure at the time of reporting.
Temporary interruption regime after extended production inactivity
Liberty Galați, formerly known as SIDEX, has operated as an integrated steel producer supplying Romanian and international industrial markets. Current difficulties were described in connection with sustained financial pressure, energy-related challenges, and rising operational constraints. Romania’s public broadcaster Radio România Actualități reported that the facility had been out of production for more than a year before employees staged a protest on 30 October.
The employment measure announced for November was framed in reporting as an additional deterioration in the company’s employment and financial condition rather than a sudden market exit. The distinction matters for assessing any potential impact on regional steel supply. A plant that has remained inactive for an extended period cannot be treated as withdrawing its full historical production capacity for the first time based only on the latest announcement.
Unpaid wages and workforce actions in Galați
The temporary unemployment arrangements are expected to affect most of the remaining workforce, while staff responsible for essential services would remain at the facility. Local reporting indicated that employees had not received wages since May 2026. On 30 October, about 300 workers demonstrated outside the Galați Prefecture, according to Romanian public radio.
The demonstration was described as seeking answers on outstanding salaries and the future of the industrial complex. Reporting also said the impact extends beyond direct employment. Liberty Galați has supported engineering and maintenance contractors, transport operators, industrial service providers, and other suppliers across Galați and surrounding areas.
A prolonged employment crisis was described as affecting household incomes and demand for services linked to the industrial site. It was also linked to continuity risks for commercial relationships connected to the steelworks. The reporting tied these effects to continued disruption in operations.
Electricity supply and transport issues cited by management
The management notice cited problems involving electricity supply and employee transportation among factors behind the temporary interruption arrangements. Romanian media also reported disputes related to the cost and availability of services required to keep operations running. Employee transport arrangements were said to have been disrupted during October.
For an integrated steelworks, long shutdown periods do not remove all operating costs, according to reporting in the notices’ coverage. Equipment preservation, maintenance activities, safety systems, and essential services are still required even when production is suspended. The condition of installations was identified as an important factor for any future assessment of whether production can restart.
Failure to maintain critical equipment during an extended shutdown could complicate recommissioning and increase restoration costs. This technical dependency was presented as part of how operational feasibility may be affected during the interruption period. The notices’ coverage therefore connected employment changes with ongoing asset-management requirements.
CBAM and EU ETS context for Romania’s steel sector
Liberty Galați’s difficulties were described alongside broader pressures facing European steel producers related to production costs, international competition, and investment needs tied to industrial decarbonisation. Romania operates within the EU Emissions Trading System (EU ETS). The Carbon Border Adjustment Mechanism (CBAM) is intended to address carbon-cost differences between covered imports and comparable European production.
Reporting also stated that CBAM is not designed as a financial rescue tool for companies facing liquidity shortages, unpaid wages, or challenges maintaining industrial operations. It does not directly resolve electricity interruptions or provide working capital. It also does not restore the technical condition of production equipment.
No verified evidence was cited linking CBAM to Liberty Galați’s current difficulties. The company’s financial problems and extended production inactivity were described as preceding the announcement about temporary unemployment. As a result, reporting treated CBAM as unrelated to the immediate causes cited in connection with Liberty Galați.
Regional sourcing considerations for steel customers
For steel traders and industrial customers, reporting said the immediate issue is whether Liberty Galați can return to production and under what conditions. Customers may need alternative suppliers in Romania, elsewhere in the European Union, or in third-country markets. Any assessment of supply impact was described as needing to consider that Liberty Galați had already reduced activity before this announcement.
A continued shutdown was described as potentially affecting future investment decisions and Romania’s ability to restore domestic steelmaking capacity. For Romania, losing a major integrated facility would affect industrial employment and supplier networks as well as longer-term manufacturing structure. The reported consequences were also expected to extend beyond steel output into transport, engineering, maintenance, and other industrial services.
Implications for Serbia and Southeast European steel markets
The situation was also described as relevant for neighbouring industrial economies including Serbia. Romanian manufacturers that previously relied on Liberty Galați may need to adjust sourcing if the plant remains inactive. Serbian producers and regional traders could compete for some demand depending on product specifications, prices, logistics, and customs requirements.
No quantified transfer of business or market share was reported as established at this stage. For cross-border purchases, reporting said key commercial factors include product availability, delivered cost, supply reliability, and contractual performance. While CBAM can influence comparative import costs entering the EU, there was no basis cited for identifying it as a determining cause of procurement changes without supporting evidence.
Restart conditions tied to financing and asset preservation
The planned temporary layoffs were described as reflecting how severe Liberty Galați’s current condition is. Maintaining industrial infrastructure may help preserve options for future production but does not guarantee operations will resume. A recovery would require addressing outstanding financial obligations alongside supplier relationships and electricity arrangements.
The technical work needed to recommission the facility was also identified as part of any restart process. Reporting characterized the case as illustrating separation between long-term policy measures aimed at strengthening industrial competitiveness and immediate financial or operational challenges faced by a distressed steel producer. It also stated that there is no evidence presented here of a direct CBAM effect on Liberty Galați’s latest decision.
